Hydram Installation


The use of a Hydram requires the availability of a suitable supply of continuously flowing water. The site needs to be suitably prepared to provide water input to the Hydram and also output side pipes for waste and delivery.

Installation of the Hydram couldn’t be easier -

1. Create a feed well to collect the source water
2. Lay a concrete slab on which to bolt the Hydram
3. Fix a drive pipe between the two
4. Install a delivery pipe from the Hydram to where the water needs to go!

The diagram and quotation box below illustrate the information that is needed to allow for quotations to be made and advice to be given. We are willing to do this for you, please download this form and return via post, fax or email.

Diagram

Question
The quantity of water to be pumped per 24 hours (litres)
The approximate quantity of water available from the spring or stream (litres per minute
Working fall which can be obtained from the water source (metres)
The vertical height to which the water is to be pumped above the level of the Hydram (metres)
The distance in which the working fall can be obtained (length of drive pipe) metres
The distance the water has to be pumped (length of delivery pipe) metres

Click here to download the above information contained in the Hydram Booklet PDF.